How does ready-mix concrete delivery work?
Ready-mix concrete is batched at a plant and delivered to you fresh and unhardened. The National Ready Mixed Concrete Association (NRMCA) explains in its guide to ordering ready mixed concrete that it is typically carried in a truck mixer, which keeps the concrete uniformly mixed until it is discharged at the placement location. It also notes that concrete normally sets and hardens within two to eight hours after mixing, so it is a perishable product.
Three parties are usually involved on pour day:
- The ready-mix supplier, which designs and batches the mix.
- The truck and driver, who carry the concrete from plant to site and discharge it where directed.
- Your site team, who receive, check and place the concrete.
In Singapore, the supply side is regulated. BCA's list of supply workheads shows that registration for workhead SY01B, supply of ready-mixed concrete, requires a Certificate of Conformity for Ready-Mixed Concrete issued by SAC.
Which standard covers ready-mix concrete delivery in Singapore?
The concrete standard used in Singapore is SS EN 206:2014, an identical adoption of the European standard EN 206:2013. Its scope covers concrete that is ready-mixed and the delivery of fresh concrete. Its delivery section covers:
| Clause | What it covers |
|---|---|
| 7.1 | Information from the user of the concrete to the producer |
| 7.2 | Information from the producer to the user |
| 7.3 | Delivery ticket for ready-mixed concrete |
| 7.5 | Mix adjustments after main mixing and before discharge |
The standard also says it does not cover health and safety for workers during production and delivery. For that, the WSH Council's workplace traffic guidance applies (see below). Your engineer's specification decides which clauses apply to your project.
What should you tell the supplier when you order?
NRMCA's checklist for ordering and scheduling ready mixed concrete, written with the American Society of Concrete Contractors, is a useful template. It asks for:
- Mix details for each placement location: mix code, strength and required consistence
- Quantity, start time, truck spacing and placement rate
- Directions to the jobsite, site access and access for the trucks
- Safety information for drivers and the wash-out area
- Placement method, such as pumping, conveyor or bucket
- Emergency contacts for schedule changes and breakdowns
Tell the producer about any schedule change as soon as it is known: NRMCA notes the crew should be ready to place when the truck arrives.
How many truck loads will you need?
Divide the pour volume by the load each truck carries, and round up. Our guide to cement mixer truck capacity explains why you plan with the rated load, not the drum size.
What should the site prepare before the first truck arrives?
A loaded mixer is heavy, and NRMCA warns that a loaded truck may not be able to manoeuvre on loose ground. Plan the route from the gate to the discharge point on firm, level ground.
The WSH Council's Workplace Traffic Safety Management guidance asks employers to plan around vehicle types, road and weather conditions and work schedules, and to demarcate pedestrian walkways from vehicle roads. On pour day, we recommend:
- A marked route from the gate to the discharge point, with a waiting area off the public road
- A traffic controller to guide trucks when reversing
- A wash-out area agreed with the supplier and site management
- Arrival times spread out so trucks do not queue outside the site
If a truck-mounted pump is on site, MOM and the Singapore Contractors Association issued a joint circular requiring pump operators who drive or reposition pumps within worksites to complete a driving course unless they hold a Class 5 licence. Our site access checklist covers gates and routes in more detail.
What should you check when the truck arrives?
NRMCA's ordering guide gives the purchaser three jobs at discharge:
- Check the delivery ticket against the mix ordered for that location, then sign it and note anything unusual.
- Direct the truck to the correct placement location.
- Take test samples at the point of discharge from the truck.
It also warns that adding water on site beyond the mix design can cause segregation, delay setting, increase cracking and reduce strength. Ask the supplier before anything is added to the drum.
While the truck is parked for discharge, NRMCA's wheel chock guidance says to set the brakes and make sure the truck is at a complete standstill before chocking. Chocks should be used in pairs and placed on the downhill side.
How Vanguard Transport fits in
We supply cement mixer trucks with Vanguard drivers as one service, allocated to a project for the length of a long-term contract. Our 19 mixers carry 9 to 14 m3 per load across Singapore: 16 of them run every day on Changi Airport Terminal 5, and 2 serve the Marina Bay Sands extension. Our drivers are briefed on site-specific hazards before mobilising. See our cement mixer truck service. Send your site details through the contact page or WhatsApp us.
For current requirements, check with BCA, the WSH Council and your engineer's specification.
Frequently asked questions
Who is responsible for ready-mix concrete quality on site?
The supplier designs and batches the mix. NRMCA's guidance says the purchaser checks each delivery ticket against the mix ordered, and that the producer cannot be responsible for quality if water or other materials are added at the jobsite.
Does a ready-mix concrete supplier need certification in Singapore?
BCA's supply workhead SY01B, supply of ready-mixed concrete, requires a Certificate of Conformity for Ready-Mixed Concrete issued by SAC. Ask your supplier for theirs.
How far ahead should I book ready-mix concrete?
NRMCA advises placing the order well in advance of the delivery date, with the start time, quantity, truck spacing and placement rate agreed. Confirm lead times with your supplier, and tell them at once if the pour moves.
Written by the Vanguard Transport team, Singapore. Sources are linked in the text.