Singapore HQ
19 Woodlands Industrial Park E1, #01-06, S757719
Operating Hours
Mon–Sat, 08:30–17:30
Phone
+65 9839 4332
bizSAFE Level 3

Marina Bay Sands extension - 2 mixer trucks

Marina Bay Sands and its three towers in March 2026, where the extension adds a fourth tower
Marina Bay Sands in March 2026, where the extension adds a fourth tower. Photo by Actuall7, CC BY 4.0, via Wikimedia Commons. Source
Marina Bay Sands extensionPublished figures for the project 55 storeysnew hotel tower570all-suite hotel rooms15,000seat arena2030expected completion

The situation

Marina Bay Sands is expanding with a fourth tower beside the existing resort. Groundbreaking took place in July 2025 on a project valued at US$8 billion. The new 55-storey tower has 570 all-suite hotel rooms, a rooftop Skyloop of 76,000 square feet at its crown, about 200,000 square feet of meeting space and a 15,000-seat arena. The design is by Safdie Architects, the firm behind the original resort, with the arena designed by Populous.

Woh Hup was appointed main contractor in March 2026. About 5,000 workers are on site, working around the clock, and completion is expected in 2030.

What the project needs

A 55-storey tower and an arena are built in concrete, floor after floor, on a site that runs around the clock. Deliveries have to arrive on time, and the trucks that make them need to know the way in.

What Vanguard Transport provides

We run two cement mixer trucks on the Marina Bay Sands extension, each with its Vanguard driver, delivering ready-mix concrete for a ready-mix supplier.

2 mixer trucks on the projectEach with its Vanguard driver

Why a dedicated truck and driver fits

Our service is a truck and a Vanguard driver supplied together, allocated to the project for its duration. On a site at Marina Bay, that means the same two trucks and the same two drivers return to the same gates and the same routes, delivery after delivery. See cement mixer truck delivery. We also deliver on larger programmes: see our project on Changi Airport Terminal 5.

How we keep it safe

Our drivers are briefed on site-specific hazards before they mobilise, on every job. Vanguard Transport holds bizSAFE Level 3 (Certificate No. E45083). See our safety approach.

The outcome

Our trucks deliver to the Marina Bay Sands extension, which is due for completion in 2030.

Frequently asked questions

How many mixer trucks does Vanguard Transport run on the Marina Bay Sands extension?

Two cement mixer trucks, each with its Vanguard driver.

What is being built at Marina Bay Sands?

A fourth tower of 55 storeys with 570 suites, a 15,000-seat arena, about 200,000 square feet of meeting space and a rooftop Skyloop, beside the existing three towers.

When will the Marina Bay Sands extension be completed?

Completion is expected in 2030.

Who is the main contractor?

Woh Hup, appointed in March 2026.

Sources for the published project figures: Global Construction Review; Focus Gaming News, 20 March 2026.

Written from information supplied by Vanguard Transport about its own work.

Planning a project that needs transport?

Tell us the scope and duration and we will size a dedicated fleet allocation around it.

Discuss a contract WhatsApp us