The situation
Terminal 5 is the next terminal at Singapore Changi Airport. Construction began in 2025, with the groundbreaking on 14 May 2025, on a 1,080-hectare site at Changi East. The terminal is designed to handle 50 million passengers a year and is expected to open in the mid-2030s, with Singapore Airlines and Scoot as its first airlines. It is planned as three sections, T5A, T5B and T5C, about one kilometre apart and linked by an underground automated people mover that also connects to Terminal 2.
The foundations are a project of their own. The S$3.8 billion substructure contract covers the foundation and basements of the main passenger terminal and the ground transportation centre, plus part of the tunnels to Terminal 2, over a site of about 140 hectares with basements up to 28 metres deep. Work at this scale is built in concrete, and it runs for years.

What the project needs
A build that runs for years depends on one thing from its concrete supply: it arrives every working day. That means mixer trucks that reach the gate on schedule, drivers who know the site and its routes, and vehicles that start every shift in good order.
What Vanguard Transport provides
We run 16 cement mixer trucks on the Terminal 5 project every day, delivering for a ready-mix concrete supplier. The trucks are a mix of 9, 12 and 14 m³ drums, each with its Vanguard driver.
Over a month, each 12 and 14 m³ truck carries between 1,600 and 2,000 m³ of concrete, and each 9 m³ truck carries between 1,200 and 1,400 m³.
What those volumes mean in loads
A 14 m³ truck carrying 2,000 m³ in a month equals about 143 full drums. A 9 m³ truck carrying 1,400 m³ equals about 156. Drum size changes how many trips a truck makes for the same volume, which is why the right mix of 9, 12 and 14 m³ trucks matters on a long contract. Our guide to cement mixer truck capacity explains how drum size, load and delivery count relate.
Why a dedicated fleet fits
Terminal 5 is the kind of contract we are built for: a truck and a Vanguard driver supplied together, allocated to the project for its duration. The same trucks and the same drivers return to the same site every day, so the routes, gates and routines become familiar. See cement mixer truck delivery, or our earlier project, mixer trucks for The Skywaters raft pour.
How we keep it safe
Our drivers are briefed on site-specific hazards before they mobilise, on every job. Vanguard Transport holds bizSAFE Level 3 (Certificate No. E45083). See our safety approach.
The outcome
Our trucks deliver to Terminal 5 every day, and the project continues into the mid-2030s.
Frequently asked questions
How many mixer trucks does Vanguard Transport run on Changi Airport Terminal 5?
16 cement mixer trucks, working on the project every day.
How much concrete does each truck carry in a month?
Each 12 and 14 m³ truck carries 1,600 to 2,000 m³ a month, and each 9 m³ truck carries 1,200 to 1,400 m³.
When will Changi Airport Terminal 5 open?
Mid-2030s. Construction began in 2025, and the terminal is designed to handle 50 million passengers a year.
What truck sizes does Vanguard Transport run?
Cement mixer trucks with 9, 12 and 14 m³ drums.
Sources for the published project figures: Mothership, 14 May 2025; Future Travel Experience, May 2025.