The situation
The Cross Island Line is Singapore's eighth MRT line and its longest fully underground line, at more than 50 km, with almost half of its stations planned as interchanges. It is being built in three phases. Phase 1 runs 29 km with 12 stations from Aviation Park to Bright Hill and is expected to begin passenger service in 2030.
At the eastern end, near Changi, the works include the Aviation Park station, the tunnels that lead away from it and the Changi East Depot. The depot is a 57-hectare at-grade facility that will stable and maintain 70 to 80 trains and house the line's operation control centre, with about 6 km of tunnels linking it to Aviation Park station.
What the works need
Underground rail is concrete work from the first excavation. LTA notes that the Aviation Park station is built in thick layers of marine clay, with a deep excavation next to surrounding structures and aviation height limits because the site is close to Changi Airport. Foundations, walls, slabs and tunnel linings all depend on concrete that arrives when the pour needs it, in the right quantity, every working day.
What Vanguard Transport provides
We have delivered ready-mix concrete to the Cross Island Line since 2024, with cement mixer trucks and Vanguard drivers supplied together for a ready-mix supplier. In the month from 29 September to 30 October 2026, our deliveries to Cross Island Line sites at Changi were:
| Contract | Deliveries | Concrete | Delivery days | Trucks used |
|---|---|---|---|---|
| CR101, Changi East Depot (Aviation Park Road) | 309 | 3,470 m³ | 32 | 17 |
| CR103, Changi Coast Road | 72 | 584 m³ | 25 | 15 |
| CR105, Changi Coast Road | 57 | 448 m³ | 17 | 16 |
| Total | 438 | about 4,500 m³ |
On the depot works that is close to ten deliveries a day, across the month. The contracts sit along the same approach roads, so our drivers know the Changi Coast Road and Aviation Park Road approaches and each site's gate.
Why a dedicated fleet fits
A rail project of this size has several contracts running side by side, each with its own pour schedule. A truck and a Vanguard driver supplied together, allocated to the work for its duration, means the same trucks and drivers return to the same gates, so routes and routines become familiar. See cement mixer truck delivery, our work on Changi Airport Terminal 5 nearby, and our guide to cement mixer truck capacity.
How we keep it safe
Our drivers are briefed on site-specific hazards before they mobilise, on every job. Vanguard Transport holds bizSAFE Level 3 (Certificate No. E45083). See our safety approach.
The outcome
Our trucks continue to deliver to the Cross Island Line works at Changi, and the build continues towards the 2030 opening of Phase 1.
Frequently asked questions
Does Vanguard Transport deliver concrete to MRT construction sites?
Yes. We have delivered ready-mix concrete to the Cross Island Line since 2024, including the Changi East Depot works.
How much concrete did Vanguard Transport deliver to the Cross Island Line in a month?
In the month to 30 October 2026 we made 438 deliveries across three contracts at Changi, about 4,500 m³ in total. 3,470 m³ of that went to the Changi East Depot works.
When will the Cross Island Line open?
LTA expects Phase 1, from Aviation Park to Bright Hill, to begin passenger service in 2030.
What trucks does Vanguard Transport use for this work?
Cement mixer trucks with drums of 9 to 14 m³, each with its Vanguard driver.
Sources for the published project facts: LTA, March 2021; LTA, November 2021; Changi East Depot. Delivery figures are from Vanguard Transport's own delivery orders.
Written from information supplied by Vanguard Transport about its own work.