The situation
The Skywaters is a 63-storey mixed-use tower at 8 Shenton Way, due to be Singapore's tallest building at 305 metres when it completes in 2028. Its foundation is a raft: one very thick slab of concrete that spreads the weight of the building over the ground. In January 2025, the raft was poured for the main contractor, China Harbour Engineering Company Ltd (Singapore Branch).
The numbers are large. The raft is 5 metres thick and took 10,250 m³ of concrete, poured without a break for 35 hours. The trade press reports that one truckload reached the site every two minutes through the pour. The pour used Grade 105 super high-strength concrete, a first for a Singapore project.
What was needed
The published figures set the demand. A continuous 35-hour pour with a truckload arriving every two minutes means mixer trucks have to keep reaching the site, discharging and returning for the whole 35 hours, with no gap in the line. That takes enough trucks and drivers who can hold a steady cycle.
What Vanguard Transport provided
Vanguard Transport delivered for the ready-mix concrete supplier with about 15 cement mixer trucks and their drivers, our whole mixer fleet at the time. Each truck went out with its Vanguard driver, the same truck-and-driver service we provide on every contract.
The scale in context
At a truckload every two minutes, 35 hours works out to about 1,050 truckloads, or close to 10 m³ per load on average across the 10,250 m³ poured. That sits within the 9 to 14 m³ drums we run. For how drum size, load and delivery count relate, see our guide to cement mixer truck capacity.
A continuous pour suits the way we work: a truck and a Vanguard driver supplied together, allocated to a project for its duration. See cement mixer truck delivery.
How we kept it safe
Our drivers are briefed on site-specific hazards before they mobilise, on every job. Vanguard Transport holds bizSAFE Level 3 (Certificate No. E45083). See our safety approach.
The outcome
The pour ran for 35 continuous hours and the raft foundation of The Skywaters was cast. It was the biggest pour our team had worked on in a long time, and it came early in Vanguard Transport's first year of operation.
Frequently asked questions
How many mixer trucks did Vanguard Transport supply to The Skywaters pour?
About 15, our whole mixer fleet at the time.
How big was the pour?
10,250 m³ of concrete for a 5-metre-thick raft, poured continuously for 35 hours, according to Trade Link Media.
Who was the main contractor?
China Harbour Engineering Company Ltd (Singapore Branch), according to Trade Link Media. Vanguard Transport delivered for the ready-mix concrete supplier on the pour.
What size are Vanguard Transport's mixer drums?
Our drums carry between 9 and 14 m³ per load.
Source for the published project figures: Trade Link Media, 14 March 2025.